Been trying to get Openreach fibre and BT phone line moved onto a new pole in our garden. The pole belongs to Western Power and they have already moved the electrics. Been going back and forth for a year now and the repayments engineer I was assigned to in July either doesn’t answer phone or email or just says he has to speak to someone else and he’ll call me back but never does. Any tips on how I can speed things up? Pole needs to be gone by end of April and Western Power said they’ll still remove it if we can get the fibre off there before that.