That document is some sort of system flow chart showing which tests an engineer should perform when presented with a fault.
The first 4 numbers correspond to the test number
The 2 numbers after the dot corresponds to the result of the test.
Based on the result entered by the engineer, the software tells him which test{s} to do next
Test Ref No 3836
"what was the result?"
3836.01 "The test passed on < TIME STAMP>." "The test passed on < TIME STAMP>."
3836.02 The test passed with amber parameters on <TIME STAMP>.
3836.03 The test failed on <TIME STAMP>. .
3836.04 The line test did not initiate.
3836.05 The test passed with resistance within permissible range, but failed due to other parameters.
Theres then steps to show which further tests should be run depending upon the result. So if test 3836 result was amber, he should then perform test 3417
eg
What was your final test?
3417 What was your final test ? 3417.01 Final Eclipse test performed at the NTE.
3417 What was your final test ? 3417.02 Final Eclipse test performed at other network location.
3417 What was your final test ? 3417.03 Final FastTest completed.
----Sorry still struggling to format this post. I'm getting so damn frustrated. Its taking me too long so Im leaving as is.
As 4 candles says, it adds nothing to what you see, but the fact that doc shows the flow system that will be part of a screen in a custom made app used by the engineers and reporting back to the ISP is why . Once the url is posted here, then google bots will pick it up and they will see more traffic coming from IPs not in their own realm.
[Moderator edit to remove multiple blank lines.]