another update.
1. not sure when this happened as i didnt see the work going on, but now numerous telegraph poles in my street now have large coils of cables mounted and attached to the poles, not sure what these cables are actually for
2. how ever a few days later i did see the boys pulling the blue rope through pipes next to the poles with the actual fiber cables attached, these fiber cables were then coiled up and the guy went up a ladder on the pole and added this coiled cable to the previoulsly coiled cables in point 1.
3. sky have sent a letter about super fast broadband going live in my street soon - asking me to pre register my interest.
we are clearly aproaching the end of this fttp build in my town / street, with the switch on date coming soon and been able to actualy order fttp, its been really interesting seeing all the work going on with my own eyes.
cant wait to finaly be able to order fttp, blyth is soon to go live at long last! (well at least in my street)
i guess and hope my next update will be when im actualy able to order it after its been turned on, as always ill update when i have any further info, thanks to everyone who has posted in this thread, i also love reading every other thread in the fttp roll out section, its all very interesting!