One thing I am intrigued about is how the contractors decide where to place the connector in the road outside each property. When they do my road in June it will be quite important to get this in the right place. There are a couple of issues, firstly we only have a gate and narrow path accessing our house but it also is concreted and beneath it runs the foul sewer, water supply pipes and the mains cabling as well, secondly our garden level is about 4 feet above the path level and we have a 5+ foot wall along our entire frontage apart form the gate & path. The final issue is getting into our house if we decide to sign up as our property is surrounded by concrete paths across the front and up both sides. The only way I see for getting a connection across our garden and to the house is to come up inside our garden wall and run along the wall which separates us from our neighbour, then over the side gate to get to the house exterior wall and run it along the wall and through at the correct place `to terminate inside. All of this means that to minimise their cable run the connector in the path needs to be at the complete other side of our property from the gate access.
Hence my interest in how they decide where to put these things.
Stuart