So, just to confirm, how much was the increase in downstream compared to db reduced?
Over the three re-syncs:
SNRM db Attainable
Line 1 6.4 - 5.3 - 4.3 - 3.3 62,059 - 65,869 - 69,699 - 73,394
Line 2 5.9 - 5.3 - 4.3 - 3.3 60,552 - 62,430 - 66,558 - 69,649
I might be able to squeeze a little more from line 2 as it is affected by line 1 and was the last to re-sync.