My grandson is moving into a new build, 1 bedroom, upstairs flat with his partner in a small 15 dwelling brand new development, OR full fibre is pre-installed with the ONT fitted and powered, Virgin have also pre-cabled (likely fibred) the complete site, inside and out, ready to go.
At the ONT location, 5 ethernet LAN sockets have also been pre-installed to points all around the flat with a double at the TV location in case the Hub needs to be situated there for optimum Wi-Fi coverage, very well thought out and engineered.
He has opted to sign up with BT for 300/50 service and was initially given a 1 week "install" date with the Hub being dispatched right away, however, OR have knocked this back to the normal 3 weeks install date, a bit disappointing considering the ONT is already in and the fibre lit, would have thought that this would have been a 5/10 minute job for the OR engineer authorising the ONT and plugging in the Hub.