Thought a thread indicating where VM are doing work to overbuild their hybrid network with full fibre would be worthwhile. I'll start. Areas in bold are those that appear prioritised - loads of work.
Batley, West Yorkshire
Leeds, West Yorkshire
Wakefield, West Yorkshire
Barnsley, South Yorkshire
Sheffield, South Yorkshire
Salisbury, Wiltshire
Stratford-upon-Avon, Warwickshire
Bristol
Glasgow