The bridging tap is clearly still present.

I wonder, does your service come via an aerial drop? If yes, is it a two pair drop cable? If yes then I wonder if at some time in the past both pairs of the drop cable were connected together (within the coffin block) at the pole top.

I've known of a couple of occasions where a similar error had been made and, after repeated visits for poor performance, the last engineer actually climbed the pole, looked, found the mistake and took corrective action.
Whilst my slow paws were typing the above, I see that Black Sheep has posted about another scenario which can give rise to the fault.
