Hey guys and gals of the forum. I know I've been a bit absent recently, just felt like I wasn't contributing. This could be the end of my hiatus if I feel like there is something I can do.
So, with that out of the way, on with the rest of the post!
I have very recently found out Gigaclear is coming next year (at at least it is commencing then), and it's not a rural environment that typically gets covered. Not complaining, since symmetrical speeds are preferred over asymmetric - even 100/100 would be better than G.fast 330/50 (which is more like 293/48 with overheads) for server work and general uploading, and perhaps I will get it if I am still here when it comes (if it does come).
I am just curious to know from those who live in Gigaclear areas:
- Did the work start near the scheduled date?
- How many months was it from when works commenced before you could order?
- Were there any issues with the installation? Including issues relating to installation preferences (such as location).
I know every area is going to be different, but I wanted to get a general idea of what to expect.
Thanks!