Author Topic: Fibre First Rollout - Intake Exchange (Sheffield)  (Read 24364 times)

Alex Atkin UK

  • Addicted Kitizen
  • *****
  • Posts: 5272
    • Thinkbroadband Quality Monitors
Re: Fibre First Rollout - Intake Exchange (Sheffield)
« Reply #75 on: April 05, 2021, 06:55:35 PM »

True, and nothing really matters until I see them putting fibre in the local ductwork anyway.  But I was quite enjoying theorising about what they were doing using the information provided.
Logged
Broadband: Zen Full Fibre 900 + Three 5G Routers: pfSense (Intel N100) + Huawei CPE Pro 2 H122-373 WiFi: Zyxel NWA210AX
Switches: Netgear MS510TXUP, Netgear MS510TXPP, Netgear GS110EMX My Broadband History & Ping Monitors

Ronski

  • Helpful
  • Kitizen
  • *
  • Posts: 4302
Re: Fibre First Rollout - Intake Exchange (Sheffield)
« Reply #76 on: April 05, 2021, 07:46:13 PM »

Same here, it was nice knowing where it was being installed etc. But alas that info's no longer available.
Logged
Formerly restrained by ECI and ali,  now surfing along at 550/52  ;D

Alex Atkin UK

  • Addicted Kitizen
  • *****
  • Posts: 5272
    • Thinkbroadband Quality Monitors
Re: Fibre First Rollout - Intake Exchange (Sheffield)
« Reply #77 on: May 10, 2021, 06:47:58 PM »

I noticed the document was updated in February and I'm back to Delayed due to operational reasons.

What's the point of keeping it listed as "to start in next 3 months" then putting in a caveat like that?
Logged
Broadband: Zen Full Fibre 900 + Three 5G Routers: pfSense (Intel N100) + Huawei CPE Pro 2 H122-373 WiFi: Zyxel NWA210AX
Switches: Netgear MS510TXUP, Netgear MS510TXPP, Netgear GS110EMX My Broadband History & Ping Monitors

Alex Atkin UK

  • Addicted Kitizen
  • *****
  • Posts: 5272
    • Thinkbroadband Quality Monitors
Re: Fibre First Rollout - Intake Exchange (Sheffield)
« Reply #78 on: May 27, 2021, 01:09:04 AM »

FINALLY, the map has changed to "build in progress" but my address lookup still hasn't updated to mention "coming soon" like it did before.

Ah well, seems things are moving forward at last.
Logged
Broadband: Zen Full Fibre 900 + Three 5G Routers: pfSense (Intel N100) + Huawei CPE Pro 2 H122-373 WiFi: Zyxel NWA210AX
Switches: Netgear MS510TXUP, Netgear MS510TXPP, Netgear GS110EMX My Broadband History & Ping Monitors

ame

  • Just arrived
  • *
  • Posts: 3
Re: Fibre First Rollout - Intake Exchange (Sheffield)
« Reply #79 on: June 01, 2021, 11:21:38 AM »

Spotted an Openreach fella looking at some poles on my street a couple of weeks ago (S2). Followed by some guys jamming things through ducts last week. Left yellow markings of 'RR' on the covers. Should I be getting excited yet?  :fingers:
Logged

kjw

  • Member
  • **
  • Posts: 64
Re: Fibre First Rollout - Intake Exchange (Sheffield)
« Reply #80 on: June 01, 2021, 11:23:51 AM »

Spotted an Openreach fella looking at some poles on my street a couple of weeks ago (S2). Followed by some guys jamming things through ducts last week. Left yellow markings of 'RR' on the covers. Should I be getting excited yet?  :fingers:

Sounds like it could be the start of something, may well be a long journey yet though :)
Logged
ZEN 900/100 via pfSense | Unifi AC-HD WiFi
Speed Test | BQM Graph

ame

  • Just arrived
  • *
  • Posts: 3
Re: Fibre First Rollout - Intake Exchange (Sheffield)
« Reply #81 on: June 01, 2021, 11:33:59 AM »

Sounds like it could be the start of something, may well be a long journey yet though :)

To be fair I can get by on my current 80Mbps line but the prospect of gigabit being available is quite nice. Although recently signed up for another 24 months with TalkTalk. Not sure if they'd let me switch to their FTTP plan mid contract. I live in a maisonette that forms the bottom of a block of flats. I'm guessing the fibre would have to come in the same way the copper does currently?
Logged

Ronski

  • Helpful
  • Kitizen
  • *
  • Posts: 4302
Re: Fibre First Rollout - Intake Exchange (Sheffield)
« Reply #82 on: June 01, 2021, 03:13:45 PM »

I'm pretty sure RR means rodded and roped.

Flats can be problematic, as they need the landlords permission to do the installation work, which means wayleaves.
Logged
Formerly restrained by ECI and ali,  now surfing along at 550/52  ;D

kjw

  • Member
  • **
  • Posts: 64
Re: Fibre First Rollout - Intake Exchange (Sheffield)
« Reply #83 on: June 01, 2021, 04:31:40 PM »

I'm pretty sure RR means rodded and roped.

Flats can be problematic, as they need the landlords permission to do the installation work, which means wayleaves.

Our new build estate has just gone live on FTTP and all the flats have been skipped due to wayleave issues.. sure its a temporary skip but must be annoying for those that live in them none the less.
« Last Edit: June 01, 2021, 04:35:56 PM by kjw »
Logged
ZEN 900/100 via pfSense | Unifi AC-HD WiFi
Speed Test | BQM Graph

Black Sheep

  • Helpful
  • Addicted Kitizen
  • *
  • Posts: 5722
Re: Fibre First Rollout - Intake Exchange (Sheffield)
« Reply #84 on: June 01, 2021, 06:44:29 PM »

To be fair I can get by on my current 80Mbps line but the prospect of gigabit being available is quite nice. Although recently signed up for another 24 months with TalkTalk. Not sure if they'd let me switch to their FTTP plan mid contract. I live in a maisonette that forms the bottom of a block of flats. I'm guessing the fibre would have to come in the same way the copper does currently?

From your description, it sounds like you fall under the MDU (Multiple Dwelling Units), tag. Conversley, other premises are classed as SDU (Single Dwelling Units).

I'm afraid we only provide capacity at the nearest point of entry into the premises (sometimes referred to as a 'buddi-box'), or where possible, in the cupboard/riser/etc where the existing copper distribution point is currently sited.

Once the whole PON is built, we partially commission the SDU aspect, leaving the MDU to be picked up by an approved contractor to install, if and when wayleaves permission is granted by the MDU landlord.

PS - I would say Ronski's guess at RR and its meaning, is a good one.
Logged

ame

  • Just arrived
  • *
  • Posts: 3
Re: Fibre First Rollout - Intake Exchange (Sheffield)
« Reply #85 on: June 01, 2021, 10:45:21 PM »

Thanks for the info. I'm not sure what the deal is with my property as I have my own access (external front door) whereas the people in the flats have their own external door leading to a communal staircase. I currently just have an Openreach socket in the hallway not far from the front door.
Logged

Alex Atkin UK

  • Addicted Kitizen
  • *****
  • Posts: 5272
    • Thinkbroadband Quality Monitors
Re: Fibre First Rollout - Intake Exchange (Sheffield)
« Reply #86 on: June 01, 2021, 11:00:30 PM »

I'm not sure it works the same with Maisonettes as they usually do not have enclosed communal areas like flats often do and most often (in Sheffield at least) are council owned.
Logged
Broadband: Zen Full Fibre 900 + Three 5G Routers: pfSense (Intel N100) + Huawei CPE Pro 2 H122-373 WiFi: Zyxel NWA210AX
Switches: Netgear MS510TXUP, Netgear MS510TXPP, Netgear GS110EMX My Broadband History & Ping Monitors

Alex Atkin UK

  • Addicted Kitizen
  • *****
  • Posts: 5272
    • Thinkbroadband Quality Monitors
Re: Fibre First Rollout - Intake Exchange (Sheffield)
« Reply #87 on: September 06, 2021, 12:01:24 PM »

Things seem to finally be picking up pace:

Charnock Hall Road, Sheffield
07 September — 09 September
Delays possible - Traffic control (give & take)
Responsibility for works: Openreach
Current status: Planned work about to start
Works reference: BC210NE00000500311431000

Moorland View, Sheffield
07 September — 09 September
Delays possible - Traffic control (Stop/Go boards)
Responsibility for works: Openreach
Current status: Planned work about to start
Works reference: BC210NE00000500311431002

Ashleigh Avenue, Sheffield
08 September — 10 September
Delays unlikely - No carriageway incursion
Responsibility for works: Openreach
Current status: Planned work about to start
Works reference: BC210NE00000500312893901

Ashleigh Drive, Ashleigh Avenue, Sheffield
08 September — 10 September
Delays unlikely - No carriageway incursion
Responsibility for works: Openreach
Current status: Planned work about to start
Works reference: BC210NE00000500312893902

Blackstock Close, Sheffield
08 September — 10 September
Delays unlikely - No carriageway incursion
Responsibility for works: Openreach
Current status: Planned work about to start
Works reference: BC210NE00000500313623801

Blackstock Crescent, Sheffield
08 September — 10 September
Delays unlikely - No carriageway incursion
Responsibility for works: Openreach
Current status: Planned work about to start
Works reference: BC210NE00000500313623800

Blackstock Road, Sheffield
08 September — 10 September
Delays unlikely - No carriageway incursion
Responsibility for works: Openreach
Current status: Planned work about to start
Works reference: BC210NE00000500313623802

Charnock View Road, Sheffield
07 September — 09 September
Delays unlikely - No carriageway incursion
Responsibility for works: Openreach
Current status: Planned work about to start
Works reference: BC210NE00000500311423200

Corker Road, Sheffield
06 September — 08 September
Delays unlikely - No carriageway incursion
Responsibility for works: Openreach
Current status: Planned work about to start
Works reference: BC210NE00000500313321600

Corker Road, Sheffield
06 September — 08 September
Delays unlikely - No carriageway incursion
Responsibility for works: Openreach
Current status: Planned work about to start
Works reference: BC210NE00000500313440200

Fleury Place, Sheffield
06 September — 06 September
Delays unlikely - Some carriageway incursion
Responsibility for works: Openreach
Current status: Planned work about to start
Works reference: BC210NE00000500311787801

Gaunt Drive, Sheffield
08 September — 10 September
Delays unlikely - No carriageway incursion
Responsibility for works: Openreach
Current status: Planned work about to start
Works reference: BC210NE00000500308911000

Gleadless Common, Sheffield
06 September — 08 September
Delays unlikely - No carriageway incursion
Responsibility for works: Openreach
Current status: Planned work about to start
Works reference: BC210NE00000500313440201

Hollinsend Road, Sheffield
07 September — 09 September
Delays unlikely - No carriageway incursion
Responsibility for works: Openreach
Current status: Planned work about to start
Works reference: BC210NE00000500312162700

Hollybank Road, Sheffield
06 September — 08 September
Delays unlikely - No carriageway incursion
Responsibility for works: Openreach
Current status: Planned work about to start
Works reference: BC210NE00000500312435900

Myrtle Springs Drive, Sheffield
08 September — 10 September
Delays unlikely - No carriageway incursion
Responsibility for works: Openreach
Current status: Planned work about to start
Works reference: BC210NE00000500312893900

Ridgeway Drive, Sheffield
06 September — 08 September
Delays unlikely - No carriageway incursion
Responsibility for works: Openreach
Current status: Planned work about to start
Works reference: BC210NE00000500313321601
Logged
Broadband: Zen Full Fibre 900 + Three 5G Routers: pfSense (Intel N100) + Huawei CPE Pro 2 H122-373 WiFi: Zyxel NWA210AX
Switches: Netgear MS510TXUP, Netgear MS510TXPP, Netgear GS110EMX My Broadband History & Ping Monitors

antsly

  • Member
  • **
  • Posts: 17
Re: Fibre First Rollout - Intake Exchange (Sheffield)
« Reply #88 on: September 24, 2021, 02:44:35 PM »

Did they actually do anything on these days? I've noticed they just don't seem to be turning up recently. My pole has supposedly had works on it for multiple days from July/August but still nothing new.
Logged

Alex Atkin UK

  • Addicted Kitizen
  • *****
  • Posts: 5272
    • Thinkbroadband Quality Monitors
Re: Fibre First Rollout - Intake Exchange (Sheffield)
« Reply #89 on: September 24, 2021, 04:54:56 PM »

No idea, mum is vulnerable so I've literally not left the house in a year. :(

A lot of these jobs have been showing up for months, but with so many coming up all at once I'm fairly confident at least some of them must be happening.

Fortunately I can see my own pole from the house so I will know once its actually done, but its not been on the list yet.
Logged
Broadband: Zen Full Fibre 900 + Three 5G Routers: pfSense (Intel N100) + Huawei CPE Pro 2 H122-373 WiFi: Zyxel NWA210AX
Switches: Netgear MS510TXUP, Netgear MS510TXPP, Netgear GS110EMX My Broadband History & Ping Monitors
Pages: 1 ... 4 5 [6] 7 8 9