Yes, sorry. I was just up, I should have looked back at your previous posts. With any luck, hopefully DLM tries to lower your target SNR to bump the speed up further. After a reset or line change, this can take a few weeks.
The first time my line was reset it took about 6 days to running at optimum. The second time it took 12 days. Others have waited a lot longer.