There would have been absolutely no issues getting power there - in fact there is a power supply there. The reason they didn't was allegedly owing to planning, because the height of the DSLAM is significantly higher than the boundary wall of properties behind it. However, these properties were built after mine - so if they're installed along with the rest of the town, this would have been a non-issue. Proper, Prior, Planning, Prevents......