Broadband Related > FTTC and FTTP Issues

My Fault- Update

<< < (2/22) > >>

Weaver:
Not long, in my experience. A lot less than 24 hours.

banger:
Engineers have been re-tested sync and have arranged for my drive to be dug up for new telephone cable

NewtronStar:
OR contractors will come in with a concrete saw to make 2 parallel cuts on the route the UG takes on driveway then they dig it away to expose old duct, and OR should have had line feed disconnected at both ends then remove the old duct and existing feed.

New duct is then placed with a pull through cord exposed and cavity is then filled in, next the new UG feed is pulled through the duct using the cord and the UG feed is then terminated by OR at both ends

banger:
Was wondering how they would do it. Only question left is when. Job number was allocated today.

NewtronStar:

--- Quote from: banger on April 07, 2017, 10:44:47 PM ---Was wondering how they would do it. Only question left is when. Job number was allocated today.

--- End quote ---

Well Openreach will need to contact the contractor and the contractor will then give them a date and time slot for your driveway Job as both party's will need to be involved at the same time.