Broadband Related => FTTP Rollout => Topic started by: meritez on November 25, 2021, 06:13:42 PM
-
I'm assuming OH means Over Head?
Telegraph Pole is on the opposite side of the road.
Order Complexity Details
Please see details for the FTTP order attributes below. Where possible an expected minimum lead time is given as a guide.
Order Raised Date:
14/11/2021
Anticipated Install Process:
1 Stage
Minimum Lead Time:
3 Working Days
Premise Type:
Single Dwelling Unit Residential
Service Notes:
OH Feed with no anticipated issues
-
Your assumption is correct. Have you got a confirmed installation date?
-
Your assumption is correct. Have you got a confirmed installation date?
26th November, tomorrow.
-
Hope it goes well, and Openreach staff show up rather than some dodgy contractors. ;D
-
No show as of yet, no text to mobile number provided, crossing fingers but not holding breath :-\
-
MJ Quinn engineer showed up at 11.
Outside work pretty much complete.
-
Installed and replying from it.
Nokia ONT, pretty install
-
Congratulations!