Broadband Related => FTTP Rollout => Topic started by: meritez on November 25, 2021, 06:13:42 PM

Title: OH Feed with no Anticipated Issues
Post by: meritez on November 25, 2021, 06:13:42 PM
I'm assuming OH means Over Head?

Telegraph Pole is on the opposite side of the road.

Quote
Order Complexity Details
Please see details for the FTTP order attributes below. Where possible an expected minimum lead time is given as a guide.
Order Raised Date:
14/11/2021
Anticipated Install Process:
1 Stage
Minimum Lead Time:
3 Working Days
Premise Type:
Single Dwelling Unit Residential
Service Notes:
OH Feed with no anticipated issues
Title: Re: OH Feed with no Anticipated Issues
Post by: RealAleMadrid on November 25, 2021, 06:22:51 PM
Your assumption is correct. Have you got a confirmed installation date?
Title: Re: OH Feed with no Anticipated Issues
Post by: meritez on November 25, 2021, 06:24:58 PM
Your assumption is correct. Have you got a confirmed installation date?

26th November, tomorrow.
Title: Re: OH Feed with no Anticipated Issues
Post by: RealAleMadrid on November 26, 2021, 08:10:49 AM
Hope it goes well, and Openreach staff show up rather than some dodgy contractors. ;D
Title: Re: OH Feed with no Anticipated Issues
Post by: meritez on November 26, 2021, 08:43:32 AM
No show as of yet, no text to mobile number provided, crossing fingers but not holding breath  :-\
Title: Re: OH Feed with no Anticipated Issues
Post by: meritez on November 26, 2021, 12:21:29 PM
MJ Quinn engineer showed up at 11.
Outside work pretty much complete.
Title: Re: OH Feed with no Anticipated Issues
Post by: meritez on November 26, 2021, 01:33:03 PM
Installed and replying from it.
Nokia ONT, pretty install
Title: Re: OH Feed with no Anticipated Issues
Post by: Weaver on November 26, 2021, 02:37:49 PM
Congratulations!