This has been flagged up at my ISP, thought folks here might want to be aware...........
BT - 20/21CN (Home/Office) National Maintenance
12:00am, 14th April 2011
BT are completing various maintenance work over the next few weeks and we're going to list this in one posting.
14th April 2011 at 02:00-04:00
BT have informed us of planned engineering works necessary to replace a BT exchange system card which is running at risk in the Cambridge Central exchange.
14th April 2011 at 03:30-05:00
BT have informed us of planned engineering works necessary to replace a BT exchange system card which is running at risk in the Manchester Irlam exchange.
15th April 2011 at 00:01-06:00
BT have informed us of planned engineering works necessary to replace a BT exchange system card which is running at risk in the East Rudham exchange.
18th April 2011 at 00:01-06:00
BT have informed us of planned engineering works necessary to perform a physical change out of ATM Line Cards and a software upgrade necessary to migrate from Junos 7.3 to Junos 10.2 in the Edinburgh Colossus exchange.
19th April 2011 at 00:01-06:00
BT have informed us of planned engineering works necessary to replace a BT exchange system card which is running at risk in the Hawkhurst exchange.
20th April 2011 at 00:01-06:00
BT have informed us of planned engineering works necessary to perform a physical change out of ATM Line Cards and a software upgrade necessary to migrate from Junos 7.3 to Junos 10.2 in the Edinburgh Colossus exchange.
21st April 2011 at 00:01-06:00
BT have informed us of planned engineering works necessary to perform a physical change out of ATM Line Cards and a software upgrade necessary to migrate from Junos 7.3 to Junos 10.2 in the Edinburgh Colossus exchange.
26th April 2011 at 00:01-06:00
BT have informed us of planned engineering works necessary to perform a physical change out of ATM Line Cards and a software upgrade necessary to migrate from Junos 7.3 to Junos 10.2 in the Edinburgh Colossus exchange.
4th May 2011 at 00:01-06:00
BT have informed us of planned engineering works necessary to perform a physical change out of ATM Line Cards and a software upgrade necessary to migrate from Junos 7.3 to Junos 10.2 in the Edinburgh Capital exchange.
6:00am, 4th May 2011
Expected end time.