No vents so I doubt it's a G.Fast pod.
That I thought it might be was the reason for my interest, but seeing it was not vented made me think not. This was confirmed by the engineer, who I understood to say it was for more lines. He did not appear sure about the fibre side of things, but there is a waiting list ATM.
He did point out to me the thick cables on r.h. side being the link to the FTTC cab
As a local I am trying to think why the need for extra capacity in the PCP. We are a mature area and I am unaware of any substantial new domestic or industrial building planned. However, was there not some sort of talk about network re-arrangements to facilitate things like G-fast?