OR engineer came and fixed AC balance. Reset DLM. Waiting 14 days for DLM to settle. Getting 60meg now. Happy.
Engineers Notes:
Found low AC Balance E Side. Changed pair PCP Node 42 E-Side Termination: From 223 To 459 MDF Node 1 D-Side Sub Node: AQ Termination: From 723 To 959. Also found faulty LiC which was also changed. PQT, Closeout and Fasttest all OK DLM Reset performed Tested and Demo'd.