As BC says, our area (Thanet) is smothered with VM works because they are installing their network. When FTTC was being installed there was a lot of scheduled works although not as much as for VM for obvious reasons.
Also they are sub contractors, not actually VM engineers who dig the trenches and install the micro ducts.